Bathrooms

Dt Bath

I did this bathroom back in 2010 it was done in Hudson Ohio.
I gutted down to studs, ran wiring where needed for gfi, lights, exhaust fan and remote control sky light. Installed a new sky light. Roughed in plumbing for bidet, toilet, pedestal sink and custom shower with moen shower accessories. Installed m/r drywall and installed tile all the way around walls and shower using the schluter-ditra system for extra protection grouted all tiles with epoxy grout. Installed all accessories in this bathroom.

Mk Bath

I did this bathroom back in 2006 it was done in Hartville Ohio.
I gutted down to studs, ran wiring where needed for gfi, lights, exhaust fan. Roughed in plumbing for toilet, vanity and tub and shower with delta shower and tub accessories. Installed m/r drywall ,taped , finished , primed and painted. Installed 18 by 18 tile on a point pattern and grouted. Installed cultured marble on the walls with 1-corner caddy with a nice shower door (basco) rain glass pattern. Installed this really nice soaker garden tubby (Acre) Installed all accessories in this bathroom.

Sk Bath

I did this bathroom back in 2004 it was done in Norton Ohio.
I gutted down to studs, ran wiring where needed for gfi, lights, exhaust fan and remote control sky light. Installed a new sky light. Roughed in plumbing for toilet, vanity and tub/ shower with delta shower accessories. Installed m/r drywall ,taped and finished and primed and painted. Installed 12 by 12 tile on a point pattern and grouted.Installed cultured marble on the walls with 1-corner caddy with a nice shower door(basco) rain glass patern. Installed all accessories in this bathroom.

LK bath project

I did this beautiful bathroom remodel in September 0f 2014, Consists of all new tile on floor using 12 by 24 on a brick pattern. I painted all cabinetry and all new wood work. I installed new granite and fixtures with under mount sinks. I installed new fixtures on the garden tub along with new tile around top of tub. Complete tear out of the shower with enlarged shower area. I custom built shower pan with seat and all new fixtures with a nice tile design from floor to ceiling. I installed clear glass shower door. All fixtures had oil rubbed bronze finishes.

S S bathroom project

I did this bath remodel in December of 2014.This was a complete gut down to studs. I updated all wiring, new drains for shower and sink. Install all new flooring with a point pattern on the tile. I installed and built custom shower base and all new tile in the shower. I painted walls and ceilings along with all new wood work.

Rabel Bathroom

I did this bathroom in Massillon in June of 2015.I did a complete tear out with custom shower and tile on the walls and ceiling. Installed new lighting, vanity and granite top with pounded out sink brushed knuckle.

LW bathroom

I did this bathroom in Hudson Ohio in November of 2015,I did a complete tear out removing 2-walls to open the bathroom up. I updated electrical Installed deep soaker tub along with subway tile in the shower and marble mosaic on the floor. Installed 2-vanaties along with some beautiful Cambria counter top with 2-bowls.

Charlie shower

removed old tile and up dated this bathroom with new tile and master shower tower

Archer master bathroom

I updated this master bathroom in October 2017.I enlarged the shower area and opened up some wall space to make room larger.

Newmans master bathroom

I updated this master bathroom in august 2017.I custom built a steam shower with sound system. I removed the garden tub and installed a beautiful double sink with quartz counter top.

Newmans down stairs bathroom

I updated this bathroom in September 2017.Although very busy, I took out a large garden tub and Installed a standard tub, opened up wall space going into the tub area. I removed large vanity sink and rerouted the plumbing and shifted the toilet and pedestal sink to that wall. Overall makes this bathroom a lot larger in space.

Boucher custom shower

I removed old fiberglass tub and created a custom shower.I ran into some plumbing issues that were resolved to move on with the custom shower.It shows all phases of the project till completed 12/15/18.This project went smooth and completed in 7 working days.

T-B master bath project

I did a complete make over with this master bathroom,includes custom shower,new soak er tub,new powder room that was a closet,new vanities with his and hers sink with new granite top.I installed new tile throughout the main bath into master closet and installed barn door to separate the 2 rooms

Jacobs upstairs bathroom project

I did this shower, removed old shower stall then built custom shower pan and tiled to the ceiling with this very popular color scheme, light grey with cream colors, white /grey flooring and curb with a warm grey grout. Installed a clear glass shower door to be able to view this beautiful shower .Then tore out old tile around garden tub and matched the same tile .

Jacobs master bathroom

I did this master' removed the old corner tub and shower stall and installed new oval soaker tub with a custom shower. Install same tile as upstairs bath very nice color combination. Installed new lighting and new vanity with new countertop. I installed floating floor in the master bedroom into the master bathroom.

Brooker bathroom project

I did a complete gut on this bathroom, built custom shower using the Irwin ice field tile with linden bliss deco. and white/grey mosaic flooring. Installed larger tile on main floor with new vanity, counter top and lighting.

Cindy bathroom project

I did a complete gut on this small bathroom I removed the fiberglass stall and gained several inches of space. I install a custom shower using the very popular Irwin ice wall tile with the linden bliss deco tile with warm grey grout. I installed new floating floor with new vanity and counter top .I installed new lighting in shower and over vanity to brighten the room up. Installed a clear glass shower door to make the bathroom appear larger and show off the tile.

Silva master bath project

I changed the bathroom around by eliminating the corner soaker tub, the 2 corner windows making it a very large walk in custom shower.
I tore out the old little shower and made that a second closet. I installed floating floor in entire master bathroom including all closets.
I used the very popular Irwin ice wall tile with the linen deco tile with a warm grey grout. I install slide arm hand held shower with the very large rain head on a separate diverter. Install a clear glass barn style sliding glass shower door.

Jim & Chris bathroom renovation

I remodeled both of bathrooms in 2021 in Wadsworth
Bath 1 removed old bath/shower unit. Installed new tub, faucet then installed tile to the ceiling.
Install new toilet and flooring for a beautiful transformation.
Master;
Removed old shower unit, soaker tub then changed the plumbing removed the windows patched siding on the exterior walls.
Custom built 60″ by 46″ shower in place of soaker tub. Installed tile on floor and walls and a new shower door.
Converted old shower to closet pantry for linens etc. Then installed new flooring with a new toilet what a huge and beautiful transformation.

Jan's bathroom renovation

I did the bathroom renovation in 2021 in Norton area.
Complete gut, updated wiring building a custom base the tiling floor and walls. Installed new flooring, cabinets, sink and faucet.
Install new lighting and exhaust fan adding a shower door to finish it off creating this beautiful bathroom renovation

Amy bathroom projects

These were complete gut and new tub and tile, flooring, vanities', tops/faucets, lighting, mirrors and lighting.
Custom shower with tile and fixtures.

Elenia bathroom project

I did this bathroom in the summer of 2022. Flooring, tub, faucets, tile work, lighting etc….

Pinkerton bathrooms

I did these bathrooms in the summer of 2022. Half bath was just new flooring, cabinet, top, faucet, mirror, toilet and light.
Hall bath was a complete gut with new tub, tile walls, flooring, toilet, sink, top, faucet, lighting and mirror painting ceiling and walls.

Baker bathroom project

I did this bathroom early summer 2022, I only removed bottom 1/2 of this bathroom then made a beautiful shower with tile and new fixtures, new flooring, toilet vanity, top and faucet.